Formal Driveway
This project features: a 3000 square foot Oaks interlock driveway, a pebble top flagstone step at the front door, 600 face feet of Owen Sound Ledgerock pillars and retaining walls as well as 160 linear feet of Indiana Limestone Coping.
Our responsibilities included: the installation of the interlocking stone driveway as well as the natural stone walls, pillars, coping including the required concrete block work. The Indiana Limestone was cut and finished on site from large slabs. In doing so, allowed us to have long coping lengths as well as long, flowing curved pieces. The interlock driveway was installed over a glycol-based snow melt system.
At the time the photos were taken, the soft landscaping and precast concrete pillar caps and wall coping were yet to be completed by the general landscape contractor.
Our responsibilities included: the installation of the interlocking stone driveway as well as the natural stone walls, pillars, coping including the required concrete block work. The Indiana Limestone was cut and finished on site from large slabs. In doing so, allowed us to have long coping lengths as well as long, flowing curved pieces. The interlock driveway was installed over a glycol-based snow melt system.
At the time the photos were taken, the soft landscaping and precast concrete pillar caps and wall coping were yet to be completed by the general landscape contractor.